Gday all. We have been working extremely hard on the railway these past few weeks. We currently have 168 metres of track down with only about 20 to go.
Rather than uploading lots of pictures showing the progress of the whole railway ill upload pictures of sections as they have progressed over the past few weeks.
Ill start with the engine shed sidings.
This shows the existing aviary and how the allignment is roughly set out. The points leading into this section are laid into place.
Sleepers and ballast are laid.
No comments:
Post a Comment